Thursday, May 22, 2014

Walls, Walls, Walls!

May 22nd

Yesterday I went out to the lot to check on the progress and there were walls! Lots of walls! It was so surreal walking through the halls we had seen on paper for the last 9 months. My first impression is that I had no idea how big our “small” 3 foot by 6 foot window would be let alone the rest of the windows. The amount of light that will be coming in will be incredible! I am so glad we stuck with big windows!

We are already seeing that we want to make some minor changes. The window placement in the master bath and 2nd bath and the pocket doors in master bath are not the right width.The windows are too close to each other. The master bath pocket doors were built to accommodate a 30 inch wide door and the plans call for a 36 inch wide door. The header heights for the pocket doors are not high enough either. We are still early in the progress and these changes will be easy to make.
K and I are frantically working to decide what doors to order when, and what windows to order and what tubs to order. I feel like we will be playing catch up for the next couple of weeks. J

 My first look as I walked up on Wednesday.

 Future location of entry porch.

These three windows are in our master bath and second bath.

Future stair well and garage wall.

Looking back at the entry room and laundry room.

 Living room

 Living room again.

  Looking down the hall with the pantry on the left.

The front door wall going up!

 This is the plumbing fail. Those pipes are supposed to be within the cutout in the plate (the plate is the 2x4 on the bottom of wall). Did you catch that?...I used a technical term IN context even!! ;) The concrete will have to be cut more to than it already is to accommodate the necessary changes.

 Second bath. The window is too close to the wall the toilet is on. No one wants to be totally exposed in front of a window while on a toilet. :)

 Master bath and closet.

Master bath curbless shower.

Outside the master bedroom.

Tuesday, May 20, 2014

Lumber delivered and concrete cut?!

May 20th


I met with Michael Mark yesterday at the lot to discuss the lay out of the walls and the window and door placement. It was very obvious that the laundry room was not plumbed correctly. The drain and water supply for the clothes washer were not properly placed; they are in the middle of the hallway floor! So Michael will be cutting into the concrete and moving the pipes back to the proper position. They finished placing the wall plates yesterday and measuring out the location of the windows and doors! Which means today there will be walls up! We listed our house yesterday and will be out of town for Memorial Day weekend. Hopefully there will be some interest and a couple of showings while we are gone. Getting the house ready for showings has been more stressful than the house build. We have so much stuff! K has been hard at work putting together some beautiful wall hangings and décor! She is amazing! J









Monday, May 19, 2014

Foundation Finished!!!

May 18th

La Duke Brothers Concrete finished the concrete Thursday and it looks great! Mimi and Papa and the rest of us went up to the lot on Saturday for a morning tour. Mimi and Papa brought the three bigger kids hard hats and construction supplies (they were a birthday gift for N from my whole side of the family) so they were busy hammering rocks and looking official! The concrete is looking good and Michael Mark is going to begin framing on Monday! J

The Birthday Boy is looking good! :)
Thanks E and K and V and J!







 The three pictures that follow are of "knoll" where I pulled out a huge amount of poison oak. it looks sooo much better and wont make you itch! :)



 The above picture is taken standing in the middle of our dinning room looking through what will be one of our sliding glass doors. Wow! Can't believe that we will be eating meals with that as the backdrop (minus the orange tractor)!



Wednesday, May 14, 2014

Knowing the difference between lumber and wood...

May 13th

We had our final foundation inspection on Monday and Passed! Tom and his crew poured concrete on the first half of the house on Tuesday and I showed up at the end of the concrete pumping at quarter to ten in the morning! They spent the rest of the day finishing the surface to a beautifully smooth texture. We decided to not cut the surface and let the concrete crack naturally. This will be easier to fill and seal than having 1/8th inch score marks in 10x10 foot squares through out the floor.
Ana White (ana-white.com) featured a concrete seal/paint that she is using in her Mom's new place. We are probably going to use that same product to finish our floors. It looks relatively easy and as she said it is much better to use a roller on a pole than to be on your hands and knees snapping together planks.








While I was there I was able to finish removing the poison oak bushes from the “knoll” area. This was the 4th or 5th day I spent some time on it and have not reacted to it. I was very careful to tape my gloves and sleeves together and to wash with Tecnu Extreme after finishing. So glad I didn't pay someone to do it!

While I was working on the poison oak our designer Jim Irvine stopped by to see how things were progressing. We chatted for a few minute and I mentioned that the framing would start Monday and that I assumed that the wood would be delivered sometime Monday (its kinda hard to build any walls without wood). He paused for a minute and looked at me and said “What did you say?” I repeated that I thought the wood would be delivered Monday. He looked at me out of the corner of his eye and said “It's LUMBER. Call it lumber. If you call it wood people will know you don't know what you are talking about.” We both laughed and I said “Right, the LUMBER will be delivered on Monday.” It is sure nice working with people who are friendly and help you look less like a idiot. :)

last night I called Ron Dinicola my sister-in-laws father who is an electrician. He agreed to give me a crash course in electrical work and to help me get going on the project. He is also going to perform the final hook up to the solar panels and the main breaker. It is a real relief knowing someone who does this for a living locally will be walking us through it! Thank you Ron!!


Thursday, May 8, 2014

Monday inspections, Tuesday through Thursday concrete!!

May 7th

Tom and Lee La Duke have been hard at work and have finished back filling the foundation with rock and then DG (decomposed Granite). Mike Mark (our plumber, framer, and who know what else we will hire him to do) made the changes we decided on in our master bath and second bath. The inspector is scheduled to come out on Monday and then we will be pouring concrete Tuesday through Thursday!

This shot is from the living room looking back through the kitchen (the two black pipes on the right are in the kitchen island)

This is looking at the kitchen and dining room areas

This shot is looking at the front door. The door will be on the left side of the wall we can see in the foreground.

This is the stair area and the garage.

This is the garage door and what will eventually be our driveway. looks like we will need a lot of fill to bring up the driveway to the level of the garage. So glad I didn't spend a lot of time moving rock for our driveway! I was planning on doing just that and K convinced me that it would be better to wait and see what would need to be moved after the foundation is poured. So glad she is so smart! :)

This area is just out side the kitchen and dinning room. This will probably be where we spend most of our time outside while our kids are young. We are planning on installing synthetic turf. It is so nice to not have to cut or water a "play area" that looks and feels like grass. :)

This is the view from the kitchen sink looking through the dining area. The rocks will be incorporated into a patio as the base. 

Tuesday, April 29, 2014

73 yards of concrete and it is just the beginning!?

April 29th

The Footings were poured yesterday!! I have some before and after concrete pictures below.

The first three are of the corner of the garage where the utilities come into the house. The large pipe is the for the electricity and the two smaller are for the water and phone lines. 



The pictures below are of the stair area between the garage and the front entry. Tom said they use 7-8 yards of concrete in this area alone. 








The next two shots are of the kitchen and dining room. the two black pipes are the drains for the sink and dishwasher in the kitchen island.

This is the opposite view from the pictures above. 

 This is the garage. Most of the rocks and soil in the foreground will be used to backfill the garage area.


This is the living room. You can see the area for the fireplace on the right.


The picture below is of the front porch. The front door will be on the left side of the porch as you walk up to the house. you would be walking from right to left in the picture to enter the house.




 The picture below is the pile of Decomposed Granite that Tom and Lee will use to fill in the void between the concrete footings.



Tom our foundation contractor was telling me today that as the inspector was walking around looking at the re-bar and the forms he and Tom were talking about the project and the inspector was commenting on how nice the area was and at that moment a family of three deer walked through the lot. As Tom put it “Paul (our inspector) was in the middle of saying how nice this area is and it was like 'Que the deer!' and they walked through! Paul got so excited and couldn't stop talking about it.” The inspector signed off on all the work that had been done and Tom poured concrete footings three days later (yesterday). If all goes quickly (unlikely) the remaining work (filling the interior areas with sand) to prepare for the slab and garage will be done by Friday. If not it will be early next week and then we can call for the last foundation inspection before the rest of the concrete is poured. So we may have a finished foundation by the weekend of the 10th! Crazy! :)

My pinky is doing very well. I can type and do most everything with it. If I tap the end of it there some slight pain but it seems to be diminishing.

Last week was very eventful and involved another trip to the Urgent Care and a semi-emergency visit to the Dentist. The good part was that these two visits were not for the same family member (that is good news isn't it...).
Wednesday night at 3 am K got up to nurse E. As she took her first step she was unaware that her lower right leg was totally asleep and mostly limp. She took the step but her foot didn't lift off the ground and she caught her toes under her and then put all her weight on the backward facing foot. She didn't know what was happening until she was falling to the ground. She then knew instantly that something was really wrong. We waited until the kids got up at 7 and we all took her to the Urgent Care for x-rays. The PA on call didn't manipulate her foot or even look at the left foot to compare the swollen foot with the other. He told her she needed to compress it to keep the swelling down?! Needless to say, we are not impressed nor totally sure the diagnosis of a sprain is correct.

While she was waiting for the results I took C and the rest of the kids to the Dentist. One of C's teeth had a chunk missing. The missing piece was about 10% of the size of the tooth. The piece fell out a few days before but it had not been bothering her. So we decided to wait until her scheduled appointment for cavity work the following week. But two nights before K fell she was complaining that she could all of sudden feel the tooth when she brushed. We were both praying that she would not wake up in the middle of the night with searing nerve pain from an exposed nerve. K called the following morning to see if we could move up the cavity work appointment. They had a cancellation so we took it. It just happened to be the same morning that we needed to make the Urgent Care visit for K. The adventure continues! :)

L (K's stepmom who lives locally) met K at the Urgent Care after I dropped her off and gave her a ride to the dentist after her appoint was finished. She then came to the house to help the following morning. She prepped food, kept the kids entertained and made K breakfast. Thank you L! T (K's sister) has been here to help over night for four nights in the last week and has been a life (or should I say foot?) saver! If it hadn't been for these two women helping in such tangible ways, K would not be recovering so well!

So now that C's tooth is fixed and K's foot is starting to get better, we are waiting with eyes wide open for the next broken bone or stitches or who knows what to happen...

:)